기준 2025_건설공사_표준품셈_00_표지및목차
2026.06.16 15:26
2025
건설공사
표준품셈
공통.토목.건축.기계설비.유지관리
목 차 1
목 차
공 통 부 문
제1장 적용기준 ······································································································· 3
1-1 일반사항 ·················································································································· 3
1-1-1 목적 ················································································································· 3
1-1-2 적용범위 ·········································································································· 3
1-1-3 적용방법 ·········································································································· 3
1-2 설계 및 수량 ··········································································································· 3
1-2-1 수량의 계산 ···································································································· 3
1-2-2 단위표준 ·········································································································· 4
1-2-3 토질 ················································································································· 6
1-2-4 재료 및 자재의 단가 ······················································································ 9
1-2-5 인력 ··············································································································· 13
1-2-6 공구 및 경장비 ····························································································· 14
1-2-7 운반 ··············································································································· 15
1-2-8 작업조 구성 및 적용 ··················································································· 18
1-3 재료 및 노임의 할증 ···························································································· 19
1-3-1 재료의 할증 ·································································································· 19
1-3-2 노임의 할증 ·································································································· 22
1-4 품의 할증 ·············································································································· 23
1-4-1 적용기준 ········································································································ 23
1-4-2 할증의 중복가산요령 ···················································································· 23
1-4-3 작업지연 ········································································································ 23
1-4-4 지세/지형 ······································································································ 24
1-4-5 위험 ··············································································································· 27
1-4-6 작업제한 ········································································································ 28
1-4-7 작업환경 ········································································································ 29
2 목 차
1-5 기타 ······················································································································· 30
1-5-1 품질관리비 ···································································································· 30
1-5-2 산업안전보건관리비 ····················································································· 30
1-5-3 산업재해보상 보험료 및 기타 ····································································· 30
1-5-4 환경관리비 ···································································································· 30
1-5-5 안전관리비 ···································································································· 31
1-5-6 사용료 ··········································································································· 31
1-5-7 현장시공상세도면의 작성 ············································································ 32
1-5-8 종합시운전 및 조정비 ·················································································· 32
1-5-9 시공측량비 ···································································································· 32
1-5-10 표준품셈 보완실사 ····················································································· 32
제2장 가설공사 ···································································································· 33
2-1 가설물의 한도 ····································································································· 33
2-1-1 현장사무소 등의 규모(토목) ········································································ 33
2-1-2 현장사무소 등의 규모(건축 및 기계설비) ·················································· 33
2-2 손율 ······················································································································· 36
2-2-1 적용기준 ········································································································ 36
2-2-2 주요자재 ········································································································ 36
2-2-3 가설시설물 ···································································································· 36
2-2-4 구조물 동바리 ······························································································ 38
2-2-5 구조물 비계 ·································································································· 38
2-2-6 축중계 ··········································································································· 38
2-2-7 규준틀 ··········································································································· 38
2-3 가설건축물 ············································································································· 39
2-3-1 철제조립식 가설건축물 설치 및 해체 ························································ 39
2-3-2 콘테이너형 가설건축물 설치 및 해체 ························································ 39
2-4 가설울타리 및 가설방음벽 ··················································································· 39
2-4-1 강관 지주 설치 및 해체 ·············································································· 39
2-4-2 H형강 지주 설치 및 해체 ··········································································· 40
2-4-3 가설울타리판 설치 및 해체 ········································································ 40
목 차 3
2-4-4 세로형 가설방음판 설치 및 해체 ······························································· 40
2-4-5 가로형 가설방음판 설치 및 해체 ······························································· 41
2-5 규준틀 ···················································································································· 41
2-5-1 토공의 비탈 규준틀 설치 및 철거 ····························································· 41
2-5-2 도로용 목재 수평규준틀 설치 및 철거 ······················································ 41
2-5-3 도로용 철재 수평규준틀 설치 및 철거 ······················································ 42
2-5-4 평.귀규준틀 설치 및 철거 ·········································································· 42
2-6 동바리 ···················································································································· 43
2-6-1 강관 동바리 설치 및 해체(토목) ································································ 43
2-6-2 강관 동바리 설치 및 해체(건축, 기계설비) ··············································· 43
2-6-3 시스템 동바리 설치 및 해체 ······································································ 44
2-6-4 알루미늄 폼 동바리 설치 및 해체 ····························································· 44
2-6-5 잭서포트 설치 및 해체 ················································································ 44
2-7 비계 ······················································································································· 45
2-7-1 강관비계 설치 및 해체 ················································································ 45
2-7-2 시스템비계 설치 및 해체 ············································································ 45
2-7-3 강관틀 비계 설치 및 해체 ·········································································· 45
2-7-4 강관 조립말비계(이동식)설치 및 해체 ······················································· 46
2-7-5 경사형 가설 계단 설치 및 해체 ································································· 46
2-7-6 타워형 가설 계단 설치 및 해체 ································································· 46
2-7-7 비계용 브라켓 설치 및 해체 ······································································ 47
2-8 추락재해방지시설 ·································································································· 47
2-8-1 낙하물 방지망(비계) 설치 및 해체 ····························································· 47
2-8-2 낙하물 방지망(플라잉넷) 설치 및 해체 ····················································· 47
2-8-3 낙하물 방지망(시스템방호) 설치 및 해체 ·················································· 48
2-8-4 교량 방호선반 설치 및 해체 ······································································ 48
2-8-5 교량 낙하물방지망 설치 및 해체 ······························································· 49
2-8-6 철골 안전망 설치 및 해체 ·········································································· 49
2-8-7 비계주위 보호망 설치 및 해체 ··································································· 49
2-8-8 갱폼주위 보호망 설치 및 해체 ··································································· 50
2-8-9 수직형 추락방망 설치 및 해체 ··································································· 50
2-8-10 안전난간대 설치 및 해체 ·········································································· 50
4 목 차
2-8-11 계단난간대 설치 및 해체 ·········································································· 50
2-8-12 안전난간대 설치 및 해체(토목) ································································ 51
2-8-13 엘리베이터 난간틀 설치 및 해체 ····························································· 51
2-8-14 엘리베이터 추락방호망 설치 및 해체 ······················································ 51
2-8-15 개구부 수평보호덮개 설치 및 해체 ························································· 52
2-8-16 강재거푸집 작업용 난간 설치 및 해체 ···················································· 52
2-8-17 수평지지로프 설치 및 해체 ······································································ 52
2-9 통행안전시설 ········································································································· 52
2-9-1 타워크레인 방호울타리 설치 및 해체 ························································ 52
2-9-2 건설용리프트 방호선반 설치 및 해체 ························································ 53
2-9-3 보행자 안전통로 설치 및 해체 ··································································· 53
2-9-4 PE드럼 설치 및 해체 ·················································································· 53
2-9-5 PE가설방호벽 설치 및 해체 ······································································· 53
2-9-6 PC가설방호벽 설치 및 해체 ······································································· 54
2-9-7 가설휀스(H-Beam기초) 설치 및 해체 ······················································· 54
2-9-8 PE가설휀스 설치 및 해체 ··········································································· 54
2-9-9 가림막 가설휀스 설치 및 해체 ··································································· 54
2-9-10 점멸등 설치 및 해체 ················································································· 54
2-9-11 유도등 설치 및 해체 ················································································· 55
2-9-12 사각지대 충돌방지장치 설치 및 해체 ······················································ 55
2-10 피해방지시설 ······································································································· 55
2-10-1 비계주위 보호막 설치 및 해체 ································································· 55
2-10-2 방진망 설치 및 해체 ················································································· 55
2-10-3 터널방음문 설치 및 해체 ·········································································· 56
2-10-4 박스형 간이흙막이 설치 및 해체 ····························································· 56
2-10-5 조립식 간이흙막이 설치 및 해체 ····························································· 56
2-10-6 비탈면 보양 ································································································ 57
2-11 현장관리 ·············································································································· 57
2-11-1 건축물보양 ·································································································· 57
2-11-2 건축물 현장정리 ························································································· 57
2-11-3 준공청소 ····································································································· 58
2-11-4 입주청소 ····································································································· 58
목 차 5
2-11-5 비산먼지 발생 억제를 위한 살수 ····························································· 58
2-11-6 자동세륜기 설치 및 해체 ·········································································· 58
2-11-7 슬러지 제거 ································································································ 59
2-11-8 지능형 CCTV 설치 및 해체 ···································································· 59
2-11-9 지능형 출입관리 설치 및 해체 ································································· 59
2-12 공통장비 ·············································································································· 60
2-12-1 건설용리프트 설치 및 해체 ······································································ 60
2-12-2 마스트 설치 및 해체 ················································································· 60
2-12-3 축중계 설치 및 해체 ················································································· 60
2-12-4 파이프 루프공 ···························································································· 61
제3장 토공사 ········································································································ 63
3-1 공통사항 ················································································································ 63
3-1-1 적용기준 ········································································································ 63
3-1-2 작업조 및 품의 변화 ··················································································· 63
3-2 굴착 ······················································································································· 63
3-2-1 굴착(인력/토사) ···························································································· 63
3-2-2 굴착(인력/암반) ···························································································· 64
3-2-3 흙깎기(기계) ·································································································· 64
3-2-4 터파기(기계) ·································································································· 65
3-3 암발파 및 파쇄 ····································································································· 66
3-3-1 암발파(미진동굴착 TYPE-Ⅰ) ····································································· 66
3-3-2 암발파(정밀진동제어발파 TYPE-Ⅱ) ·························································· 67
3-3-3 암발파(소규모진동제어발파 TYPE-Ⅲ) ······················································· 67
3-3-4 암발파(중규모진동제어발파 TYPE-Ⅳ) ······················································· 67
3-3-5 암발파(일반발파 TYPE-Ⅴ) ········································································· 67
3-3-6 암발파(대규모발파 TYPE-Ⅵ) ····································································· 67
3-3-7 암발파(소형브레이커) ··················································································· 69
3-3-8 암파쇄(유압식 할암공법) ············································································· 69
3-3-9 수중발파 ········································································································ 70
3-4 쌓기 ······················································································································· 70
6 목 차
3-4-1 흙쌓기 ··········································································································· 70
3-4-2 암쌓기 ··········································································································· 71
3-4-3 흙 다지기 ······································································································ 71
3-4-4 뒤채움 및 다짐(소형장비) ············································································ 71
3-4-5 뒤채움 및 다짐(대형장비) ············································································ 72
3-4-6 되메우기 및 다짐(소형장비) ········································································ 72
3-4-7 되메우기 및 다짐(대형장비) ········································································ 72
3-4-8 기초지정 ········································································································ 73
3-5 절토부대공 ············································································································· 73
3-5-1 절토면 고르기 ······························································································ 73
3-5-2 암반청소 ········································································································ 73
3-6 성토부대공 ············································································································· 74
3-6-1 성토면 고르기 ······························································································ 74
3-6-2 식재면 고르기 ······························································································ 74
3-7 비탈면 보호공 ······································································································· 74
3-7-1 프리캐스트 콘크리트 블록설치 ··································································· 74
3-7-2 지압판블록 설치 ··························································································· 75
3-7-3 천연섬유사면보호공 설치 ············································································ 75
3-7-4 절토사면 녹화 ······························································································ 75
3-7-5 비탈면 보강공 ······························································································ 77
3-8 보강토 옹벽 ··········································································································· 78
3-8-1 패널 설치 ······································································································ 78
3-8-2 블록 설치 ······································································································ 79
3-8-3 버팀목 설치.해체 ························································································· 79
3-8-4 뒤채움 및 다짐 ····························································································· 79
3-9 벌개제근 ················································································································ 80
3-9-1 벌목 ··············································································································· 80
3-9-2 뿌리뽑기 ········································································································ 80
3-10 개간 ····················································································································· 81
3-10-1 답면고르기 ·································································································· 81
3-11 스마트 토공 ········································································································ 81
목 차 7
3-11-1 머신 가이던스(MG) 굴착기 ······································································· 81
3-11-2 머신 컨트롤(MC) 굴착기 ·········································································· 82
3-11-3 머신 가이던스(MG) 불도저 ······································································· 83
3-11-4 머신 컨트롤(MC) 불도우저 ······································································· 83
제4장 조경공사 ···································································································· 85
4-1 잔디 및 초화류 ····································································································· 85
4-1-1 잔디붙임 ········································································································ 85
4-1-2 초류종자 살포(기계살포) ············································································· 85
4-1-3 초화류 식재 ·································································································· 86
4-1-4 거적덮기 ········································································································ 86
4-2 관목 ······················································································································· 86
4-2-1 굴 취 ············································································································· 86
4-2-2 식재(단식(單植)) ···························································································· 87
4-2-3 식재(군식(群植)) ···························································································· 87
4-3 교목 ······················································································································· 88
4-3-1 뿌리돌림 ········································································································ 88
4-3-2 굴취(나무높이) ······························································································ 88
4-3-3 굴취(근원직경) ······························································································ 89
4-3-4 식재(나무높이) ······························································································ 89
4-3-5 식재(흉고직경) ······························································································ 90
4-4 조경구조물 ············································································································· 91
4-4-1 정원석 쌓기 및 놓기 ··················································································· 91
4-4-2 조경유용석 쌓기 및 놓기 ············································································ 91
4-4-3 잔디블록 포장 ······························································································ 91
4-4-4 야자섬유매트포장 ························································································· 92
제5장 기초공사 ···································································································· 93
5-1 흙막이 및 물막이 ································································································· 93
5-1-1 P.P마대 및 톤마대 쌓기.헐기 ···································································· 93
5-1-2 H-Beam 설치 ······························································································ 93
8 목 차
5-1-3 H-Beam 철거 ······························································································ 94
5-1-4 흙막이판 설치.철거 ····················································································· 95
5-1-5 어스앵커 공법 ······························································································ 95
5-2 연약지반처리 ········································································································· 97
5-2-1 매트부설 ········································································································ 97
5-2-2 고압분사 주입공법 ······················································································· 98
5-2-3 플라스틱 보드 드레인(PBD) ····································································· 101
5-2-4 다짐말뚝 ····································································································· 103
5-3 말뚝 ····················································································································· 105
5-3-1 기성말뚝 기초 ···························································································· 105
5-3-2 말뚝박기용 천공 ························································································· 109
5-3-3 말뚝두부정리(강관) ···················································································· 111
5-3-4 말뚝두부정리(콘크리트) ············································································· 112
5-3-5 현장타설말뚝 ······························································································ 112
5-4 차수 ····················································································································· 116
5-4-1 차수재공 ····································································································· 116
제6장 철근콘크리트공사 ···················································································· 119
6-1 콘크리트 ·············································································································· 119
6-1-1 레디믹스트콘크리트 타설 ·········································································· 119
6-1-2 현장비빔타설 ······························································································ 119
6-1-3 표면 마무리 ································································································ 120
6-1-4 콘크리트 펌프차 타설 ··············································································· 120
6-1-5 에폭시(Epoxy) 콘크리트 접착제 바르기 ················································· 122
6-1-6 콘크리트 치핑(Chipping) ········································································· 122
6-2 철근 ····················································································································· 123
6-2-1 적용범위 ····································································································· 123
6-2-2 현장가공 ····································································································· 123
6-2-3 현장조립 ····································································································· 124
6-2-4 공장가공 ····································································································· 124
6-2-5 철근의 기계적 이음 ··················································································· 125
목 차 9
6-3 거푸집 ·················································································································· 125
6-3-1 합판거푸집 설치 및 해체 ·········································································· 125
6-3-2 강재거푸집 설치 및 해체 ·········································································· 127
6-3-3 유로폼 설치 및 해체 ················································································· 128
6-3-4 문양거푸집(판넬) 설치 및 해체 ································································ 129
6-3-5 합성수지(P.E)원형 맨홀 거푸집 설치 및 해체 ········································ 129
6-3-6 슬립폼 공법 ································································································ 130
6-3-7 알루미늄폼 설치 및 해체 ·········································································· 131
6-3-8 갱폼 설치 및 해체 ····················································································· 131
6-3-9 지수판 설치 ································································································ 132
6-3-10 신축이음(Expansion Joint) 설치 ·························································· 133
6-4 포스트텐션(Post Tension) 구조물 제작 ························································· 134
6-4-1 PSC빔 제작 ································································································ 134
6-4-2 PSC BOX 설치 ························································································· 137
6-5 교량 가설공 ········································································································ 139
6-5-1 빔 가설공 ··································································································· 139
6-5-2 솔 플레이트(Sole Plate) 용접 ································································· 140
6-6 교량 부대공 ········································································································ 140
6-6-1 교량받침 설치(육상) ··················································································· 140
6-6-2 교량받침 설치(수상) ··················································································· 142
6-6-3 교량신축이음장치 설치(도로교) ································································ 143
6-6-4 교량신축이음장치 설치(철도교) ································································ 143
6-6-5 교량점검시설 점검통로 설치 ···································································· 143
6-6-6 교량점검시설 점검계단 설치 ···································································· 144
6-6-7 프리캐스트 콘크리트 패널 설치 ······························································· 144
6-6-8 교량배수시설 설치 ····················································································· 145
6-7 조립식 구조물 설치공 ························································································ 145
6-7-1 플륨관 설치 ································································································ 145
6-7-2 조립식 PC맨홀 설치 ·················································································· 146
6-7-3 PC BOX 설치 ··························································································· 146
6-7-4 PC기둥 설치 ······························································································ 147
6-7-5 PC벽체 설치 ······························································································ 147
10 목 차
6-7-6 PC거더 설치 ······························································································ 147
6-7-7 PC슬래브 설치 ··························································································· 148
6-7-8 모르타르 주입 ···························································································· 148
6-7-9 모듈러 건축 설치 ······················································································· 148
제7장 돌공사 ······································································································ 151
7-1 돌쌓기 ·················································································································· 151
7-1-1 메쌓기 ········································································································· 151
7-1-2 찰쌓기 ········································································································· 151
7-2 돌붙임 ·················································································································· 151
7-2-1 메붙임 ········································································································· 151
7-2-2 찰붙임 ········································································································· 152
7-3 전석쌓기 및 깔기 ······························································································· 153
7-3-1 전석쌓기 ····································································································· 153
7-3-2 전석깔기 ····································································································· 153
7-4 석재판 붙임 ········································································································ 153
7-4-1 습식공법 ····································································································· 153
7-4-2 앵커지지 공법 ···························································································· 154
7-4-3 강재트러스 지지공법 ················································································· 154
제8장 건설기계 ·································································································· 151
8-1 적용기준 ·············································································································· 155
8-1-1 건설기계 선정기준 ····················································································· 155
8-1-2 공사규모별 표준건설기계 ·········································································· 155
8-1-3 운반 및 수송 ······························································································ 156
8-1-4 시공능력 산정 기본식 ··············································································· 158
8-1-5 기계경비 용어와 정의 ··············································································· 159
8-1-6 기계경비 적산요령 ····················································································· 159
8-1-7 손료보정 등 ································································································ 159
8-2 시공능력 ·············································································································· 160
목 차 11
8-2-1 불도저 ········································································································· 160
8-2-2 리퍼(유압식) ······························································································· 162
8-2-3 굴착기 ········································································································· 163
8-2-4 트랜처 ········································································································· 165
8-2-5 로더 ············································································································· 166
8-2-6 모터 스크레이퍼 ························································································· 168
8-2-7 모터 그레이더 ···························································································· 170
8-2-8 덤프트럭 ····································································································· 171
8-2-9 롤러 ············································································································· 174
8-2-10 아스팔트 플랜트 ······················································································ 177
8-2-11 스테이빌라이저(노상안정기) ···································································· 177
8-2-12 크러셔 ······································································································· 178
8-2-13 대형브레이커 ···························································································· 184
8-2-14 압쇄기(콘크리트 소할용) ········································································· 185
8-2-15 법면다짐기 ································································································ 186
8-2-16 골재세척설비 ···························································································· 186
8-2-17 콘크리트 믹서 ·························································································· 186
8-2-18 콘크리트 배치플랜트(강제 혼합식) ························································· 186
8-2-19 콘크리트 운반 ·························································································· 187
8-2-20 기관차 ······································································································· 188
8-2-21 경운기 ······································································································· 189
8-2-22 디젤 파일 해머 ························································································ 190
8-2-23 유압 파일 해머 ························································································ 194
8-2-24 진동파일 해머 ·························································································· 198
8-2-25 진동파일해머(워터제트 병용 압입공) ····················································· 203
8-2-26 유압식 압입 인발기(유압식 압입 인발공) ············································· 206
8-2-27 수중펌프 ··································································································· 208
8-2-28 터널전단면 굴착기(TBM) ········································································ 209
8-2-29 펌프식 준설선 ·························································································· 210
8-2-30 그래브 준설선 ·························································································· 215
8-2-31 쇄암선(중추식) ························································································· 218
8-2-32 이동식 임목파쇄기 ··················································································· 219
8-2-33 하천골재채취선 ························································································ 220
12 목 차
8-3 기계손료 ·············································································································· 221
8-3-1 [00]토공기계 ······························································································· 221
8-3-2 [10]다짐기계 ······························································································· 226
8-3-3 [20]운반 및 하역기계 ················································································ 228
8-3-4 [30]포장기계 ······························································································· 232
8-3-5 [40]콘크리트기계 ······················································································· 235
8-3-6 [50]골재생산기계 등 ·················································································· 238
8-3-7 [60]기초공사용 기계 ·················································································· 247
8-3-8 [70]기타기계 ······························································································· 252
8-3-9 [80]스마트 건설장비 ·················································································· 261
8-3-10 [90]해상장비 ···························································································· 262
8-4 운전경비 산정 ····································································································· 266
8-4-1 [00]토공기계 ······························································································· 266
8-4-2 [10]다짐기계 ······························································································· 268
8-4-3 [20]운반 및 하역기계 ················································································ 269
8-4-4 [30]포장기계 ······························································································· 271
8-4-5 [40]콘크리트기계 ······················································································· 271
8-4-6 [50]골재생산기계 등 ·················································································· 272
8-4-7 [60]기초공사용 기계 ·················································································· 273
8-4-8 [70]기타기계 ······························································································· 274
8-4-9 [90]해상기계 ······························································································· 276
8-5 기계가격 ·············································································································· 278
8-5-1 [00]토공기계 ······························································································· 278
8-5-2 [10]다짐기계 ······························································································· 281
8-5-3 [20]운반 및 하역기계 ················································································ 282
8-5-4 [30]포장기계 ······························································································· 284
8-5-5 [40]콘크리트기계 ······················································································· 285
8-5-6 [50]골재생산기계 등 ·················································································· 286
8-5-7 [60]기초공사용기계 ···················································································· 288
8-5-8 [70]기타기계 ······························································································· 290
8-5-9 [80]스마트 건설장비 ·················································································· 293
8-5-10 [90]해상기계 ···························································································· 293
목 차 13
토 목 부 문
제1장 도로포장공사 ··························································································· 299
1-1 공통사항 ·············································································································· 299
1-1-1 교통통제 및 안전처리 ··············································································· 299
1-1-2 유도선 설치 및 해체 ················································································· 299
1-2 동상방지층 ·········································································································· 299
1-2-1 인력식 소규모장비 포설 ············································································ 299
1-2-2 기계포설(길어깨) ························································································ 300
1-2-3 기계포설(본선) ···························································································· 300
1-3 보조기층 ·············································································································· 300
1-3-1 인력식 소규모장비 포설 ············································································ 300
1-3-2 기계포설(길어깨) ························································································ 301
1-3-3 기계포설(본선) ···························································································· 301
1-4 입도조정기층 ······································································································· 301
1-4-1 인력식 소규모장비 포설 ············································································ 301
1-4-2 기계포설(길어깨) ························································································ 302
1-4-3 기계포설(본선) ···························································································· 302
1-5 아스콘 포장 ········································································································ 302
1-5-1 텍코팅 및 프라임 코팅 살포 ···································································· 302
1-5-2 아스팔트 기층 소규모포설 ········································································ 303
1-5-3 아스팔트 기층 기계포설(소형장비) ··························································· 303
1-5-4 아스팔트 기층 기계포설(대형장비) ··························································· 304
1-5-5 아스팔트 표층 소규모포설 ········································································ 304
1-5-6 아스팔트 표층 기계포설(소형장비) ··························································· 305
1-5-7 아스팔트 표층 기계포설(대형장비) ··························································· 305
1-5-8 쇄석 매스틱 아스팔트(SMA) 표층 포설 ·················································· 306
1-5-9 배수성·저소음 아스팔트 표층 포설 ························································· 306
1-6 콘크리트 포장 ····································································································· 307
1-6-1 린 콘크리트 기층 포설 ············································································· 307
14 목 차
1-6-2 표층 인력포설 ···························································································· 307
1-6-3 콘크리트 표층 기계포설(소형장비) ··························································· 308
1-6-4 콘크리트 표층 기계포설(대형장비) ··························································· 308
1-6-5 기계포설 장비조립 및 해체 ······································································ 309
1-6-6 포장줄눈 절단 ···························································································· 309
1-6-7 포장줄눈 설치 ···························································································· 309
1-7 저속도로포장 ······································································································· 310
1-7-1 보도용 블록 설치(소형) ············································································· 310
1-7-2 보도용 블록 설치(대형) ············································································· 310
1-7-3 투수아스팔트 표층 소규모포설 ································································· 311
1-7-4 투수아스팔트 표층 기계포설(소형장비) ··················································· 311
1-7-5 탄성포장재 포설 ························································································· 312
1-8 교통시설공 ·········································································································· 312
1-8-1 교통 안전표지판 설치 ··············································································· 312
1-8-2 도로 표지판 설치 ······················································································· 312
1-8-3 도로반사경 설치 ························································································· 313
1-8-4 도로표지병 설치 ························································································· 313
1-8-5 시선유도표지 설치 ····················································································· 313
1-8-6 볼라드 설치 ································································································ 314
1-8-7 주차 블록 설치 ·························································································· 314
1-8-8 차선규제봉 설치 ························································································· 314
1-8-9 차선도색 ····································································································· 314
1-8-10 가드레일 설치 ·························································································· 317
1-8-11 중앙분리대 설치(가드레일식) ·································································· 317
1-8-12 중앙분리대 설치(콘크리트포설식) ·························································· 318
1-8-13 유색포장(미끄럼방지) ··············································································· 318
1-8-14 표시못 설치 ······························································································ 319
1-8-15 L형측구 설치(포설식) ·············································································· 319
1-9 부대공 ·················································································································· 320
1-9-1 방음벽 설치 ································································································ 320
1-9-2 보차도 및 도로경계블록 설치 ··································································· 321
1-9-3 낙석방지책 설치 ························································································· 321
목 차 15
1-9-4 낙석방지망 설치 ························································································· 322
제2장 하천공사 ·································································································· 325
2-1 사석 ····················································································································· 325
2-1-1 사석부설 ····································································································· 325
2-1-2 사석고르기 ·································································································· 325
2-2 돌망태 ·················································································································· 325
2-2-1 타원형 돌망태 설치 ··················································································· 325
2-2-2 매트리스형 돌망태 설치 ············································································ 326
2-2-3 돌망태형옹벽 설치 ····················································································· 326
2-3 하천호안공 ·········································································································· 326
2-3-1 식생매트 설치 ···························································································· 326
2-3-2 블록 붙이기(인력) ······················································································ 327
2-3-3 블록 붙이기(기계) ······················································································ 327
제3장 터널공사 ·································································································· 329
3-1 공통사항 ·············································································································· 329
3-1-1 터널노임 산정식 ························································································· 329
3-1-2 터널 여굴(餘掘)량 ······················································································ 329
3-2 터널굴착 ·············································································································· 330
3-2-1 터널굴착 1발파당 싸이클 시간(Cycle Time) ········································ 330
3-2-2 기계굴착의 능력 ························································································· 331
3-2-3 천공기계의 천공속도 ················································································· 332
3-2-4 터널 굴착시 천공 및 버력처리 장비의 조합 ··········································· 333
3-2-5 터널굴착 1발파당 작업인원 ······································································ 333
3-3 현장 타설 콘크리트 라이닝 ··············································································· 334
3-3-1 터널 철재거푸집 설치.해체.이동 ····························································· 334
3-4 부대공 ·················································································································· 335
3-4-1 터널 방수 ··································································································· 335
3-4-2 작업대차 조립 및 해체 ············································································· 335
16 목 차
3-4-3 터널바닥 암반청소 ····················································································· 336
제4장 궤도공사 ·································································································· 337
4-1 공통공사 ·············································································································· 337
4-1-1 철도안전처리 ······························································································ 337
4-2 자갈궤도 ·············································································································· 337
4-2-1 궤광조립 ····································································································· 337
4-2-2 궤도양로 ····································································································· 337
4-2-3 자갈살포 ····································································································· 338
4-2-4 자갈고르기 ·································································································· 338
4-3 콘크리트 궤도 ····································································································· 338
4-3-1 궤광조립 ····································································································· 338
4-3-2 궤광거치 ····································································································· 339
4-3-3 타설후 정리 ································································································ 339
4-4 분기기 ·················································································································· 340
4-4-1 분기기 부설 ································································································ 340
4-4-2 신축이음매 부설 ························································································· 340
4-5 궤도용접 ·············································································································· 341
4-5-1 가스압접 ····································································································· 341
4-5-2 테르밋 용접 ································································································ 342
4-5-3 장대레일 설정 ···························································································· 342
4-6 부대공사 ·············································································································· 343
4-6-1 자갈채집 및 운반 ······················································································· 343
4-6-2 레일 절단 ··································································································· 343
4-6-3 레일 천공 ··································································································· 343
4-6-4 침목천공 ····································································································· 343
4-6-5 파워렌치 조임 및 해체 ············································································· 344
4-6-6 타이템퍼 다짐 ···························································································· 344
4-6-7 교상발판 설치 ···························································································· 344
4-6-8 교상가드레일 설치 ····················································································· 344
4-6-9 교량침목고정장치 설치 ·············································································· 344
목 차 17
4-6-10 목침목 탄성체결장치 설치 ······································································ 345
제5장 강구조공사 ······························································································· 347
5-1 강교제작(공장제작) ····························································································· 347
5-1-1 강교 기본제작공수 ····················································································· 347
5-1-2 강교 제작공수 산정방법 ············································································ 347
5-1-3 재료비 ········································································································· 350
5-2 강교도장 ·············································································································· 350
5-2-1 소재 표면처리 ···························································································· 350
5-2-2 제품 표면처리 ···························································································· 351
5-2-3 도장재료 사용량 ························································································· 351
5-2-4 도장 ············································································································· 352
5-3 강재거더 가설 ····································································································· 352
5-3-1 강재거더 지조립 ························································································· 352
5-3-2 강재거더 가설 ···························································································· 353
5-3-3 기타 부재 설치 ·························································································· 354
제6장 관부설 및 접합공사 ················································································ 353
6-1 공통사항 ·············································································································· 355
6-1-1 적용기준 및 범위 ······················································································· 355
6-2 주철관 ·················································································································· 356
6-2-1 타이튼 접합 및 부설 ················································································· 356
6-2-2 K.P 메커니컬 접합 및 부설 ····································································· 356
6-2-3 관 절단 ······································································································· 357
6-3 강관 ····················································································································· 358
6-3-1 부설 ············································································································· 358
6-3-2 용접 접합 ··································································································· 359
6-3-3 도장 ············································································································· 360
6-3-4 절단 ············································································································· 361
6-4 P.V.C관 ··············································································································· 361
18 목 차
6-4-1 T.S 접합 및 부설 ······················································································ 361
6-4-2 고무링 접합 및 부설 ················································································· 361
6-5 P.E관 ··················································································································· 362
6-5-1 조임식 접합 및 부설 ················································································· 362
6-5-2 밴드 접합 및 부설 ····················································································· 362
6-5-3 소켓융착 접합 및 부설 ············································································· 362
6-5-4 바트융착 접합 및 부설 ············································································· 363
6-5-5 분기관 천공 및 접합 ················································································· 363
6-6 원심력 철근콘크리트관 ······················································································ 364
6-6-1 소켓관 부설 및 접합 ················································································· 364
6-6-2 수밀밴드 접합 및 부설 ············································································· 365
6-6-3 절단 ············································································································· 365
6-6-4 천공 및 접합 ······························································································ 366
6-7 기타관 ·················································································································· 366
6-7-1 PC관 부설 및 접합 ··················································································· 366
6-7-2 파형강관 부설 및 접합 ············································································· 367
6-7-3 유리섬유복합관 부설 및 접합 ··································································· 368
6-7-4 내충격PVC수도관 부설 및 접합 ······························································ 369
6-7-5 강관압입추진공 ··························································································· 369
6-8 밸브 ····················································································································· 371
6-8-1 주철제 게이트 제수밸브 부설 및 접합 ···················································· 371
6-8-2 강관제 게이트 제수밸브 부설 및 접합 ···················································· 372
6-8-3 주철제.강관제 버터플라이 제수밸브 부설 및 접합 ································ 373
6-8-4 부단수 할정자관 부설 및 접합 ································································· 374
6-8-5 부단수 천공 분기점 분기 ·········································································· 375
6-8-6 부단수 천공 새들분수전 분기점 분기 ······················································ 376
6-8-7 플랜지 조인트 접합 ··················································································· 377
제7장 항만공사 ·································································································· 379
7-1 설계기준 ·············································································································· 379
7-1-1 수중공사 ····································································································· 379
목 차 19
7-1-2 예인선 조합 ································································································ 379
7-1-3 준설선 선단 조합 ······················································································· 380
7-1-4 준설선 취업시간 및 운전시간 ··································································· 381
7-2 사석 ····················································································································· 381
7-2-1 적재 및 운반 ······························································································ 381
7-2-2 해상투하 ····································································································· 382
7-2-3 육상투하 ····································································································· 382
7-2-4 수상고르기 ·································································································· 382
7-2-5 수중고르기 ·································································································· 383
7-3 블록 ····················································································································· 384
7-3-1 케이슨 진수 ································································································ 384
7-3-2 케이슨 거치 ································································································ 384
7-3-3 일반블록 거치 ···························································································· 384
7-3-4 소파블록 거치 ···························································································· 384
7-4 준설 ····················································································································· 385
7-4-1 배송관 접합 ································································································ 385
7-4-2 배송관 띄우개(부함) 접합 ········································································· 386
7-4-3 배송관 진수 ································································································ 386
7-4-4 준설여굴 ····································································································· 387
7-4-5 펌프준설 매립시의 유보율 등 ··································································· 387
7-4-6 펌프준설 매립시의 유실률 ········································································ 388
7-4-7 매립설계수량 ······························································································ 388
제8장 지반조사 ·································································································· 389
8-1 보링 ····················································································································· 389
8-1-1 기계기구 설치 ···························································································· 389
8-1-2 천공(토사, 자갈 및 호박돌층) ··································································· 389
8-1-3 천공(암반층) ······························································································· 389
8-2 시험 ····················································································································· 390
8-2-1 표준관입시험 ······························································································ 390
8-2-2 베인전단시험 ······························································································ 391
20 목 차
8-2-3 자연시료 채취 ···························································································· 391
8-2-4 평판재하시험 ······························································································ 391
8-2-5 동재하시험 ·································································································· 392
8-2-6 정재하시험 ·································································································· 392
8-2-7 콘관입시험 ·································································································· 392
8-3 물리탐사 ·············································································································· 393
8-3-1 굴절법 탄성파 탐사 ··················································································· 393
8-3-2 2차원 전기비저항탐사 ··············································································· 393
8-4 대구경 보링(지하수개발) ···················································································· 394
8-4-1 천공(토사, 모래, 자갈 및 호박돌층) ························································ 394
8-4-2 천공(암반층) ······························································································· 395
8-4-3 폐공 되메우기 ···························································································· 397
제9장 측 량 ······································································································· 399
9-1 기준점 측량 ········································································································ 399
9-1-1 GNSS에 의한 기준점 측량 ······································································· 399
9-1-2 1급 기준점 측량 ························································································ 400
9-1-3 2급 기준점 측량 ························································································ 401
9-1-4 3급 기준점 측량 ························································································ 403
9-1-5 4급 기준점 측량 ························································································ 404
9-2 수준측량 ·············································································································· 406
9-2-1 기본 수준측량 ···························································································· 406
9-2-2 1급 수준측량 ······························································································ 409
9-2-3 2급 수준측량 ······························································································ 410
9-2-4 3급 GNSS 높이측량 ·················································································· 412
9-2-5 4급 GNSS 높이측량 ·················································································· 413
9-3 지형 및 토지측량 ······························································································· 415
9-3-1 지형현황 ····································································································· 415
9-3-2 하천측량 ····································································································· 419
9-3-3 택지조성측량 ······························································································ 421
9-3-4 구획정리 확정측량 ····················································································· 424
목 차 21
9-3-5 용지측량 ····································································································· 431
9-3-6 도시계획선(인선) ························································································ 433
9-4 노선측량 ·············································································································· 433
9-4-1 노선측량(철도, 도로 신설) ········································································ 433
9-4-2 수도노선측량 ······························································································ 435
9-4-3 디지털 도로대장 작성 ··············································································· 437
9-5 지도제작 ·············································································································· 444
9-5-1 항공사진촬영 ······························································································ 444
9-5-2 대공표지 ····································································································· 452
9-5-3 사진 기준점 측량 ······················································································· 453
9-5-4 수치지도 작성 ···························································································· 453
9-5-5 건물 및 지상물체 항공사진 .판독작업.·················································· 492
9-5-6 지도제작(기본도) ························································································ 493
9-5-7 토지이용 현황도 제작 ··············································································· 495
9-5-8 상각비 산정 ································································································ 496
9-5-9 정밀도로지도 구축 ····················································································· 496
9-5-10 무인비행장치 측량 ··················································································· 498
9-6 지적기준점측량 ··································································································· 501
9-6-1 지적삼각측량 ······························································································ 501
9-6-2 지적도근점측량 ··························································································· 502
9-6-3 지적기준점현황조사 ··················································································· 504
9-7 신규등록측량 ······································································································· 505
9-7-1 신규등록측량(도해) ···················································································· 505
9-7-2 신규등록측량(수치) ···················································································· 507
9-7-3 토지구획정리 신규등록 측량(수치) ··························································· 508
9-7-4 경지구획정리 신규등록 측량(수치) ··························································· 510
9-8 등록전환 측량 ····································································································· 511
9-8-1 등록전환 측량(도해) ··················································································· 511
9-8-2 등록전환 측량(수치) ··················································································· 513
9-9 분할측량 ·············································································································· 514
9-9-1 분할측량(도해) ···························································································· 514
22 목 차
9-9-2 분할측량(수치) ···························································································· 516
9-10 축척변경 측량 ··································································································· 518
9-10-1 축척변경 측량(도해지역에서 도해지역으로) ·········································· 518
9-10-2 축척변경 측량(도해지역에서 수치지역으로) ·········································· 519
9-11 지적확정측량 ···································································································· 521
9-11-1 토지구획정리 지적확정측량 ···································································· 521
9-11-2 경지구획정리 지적확정측량 ···································································· 524
9-12 예정지적좌표도 작성업무 ················································································ 526
9-12-1 예정지적좌표도 작성업무 ········································································ 526
9-13 지적재조사측량 ································································································· 527
9-13-1 지적재조사측량 ························································································ 527
9-14 경계복원 측량 ··································································································· 528
9-14-1 경계복원 측량(도해) ················································································ 528
9-14-2 경계복원 측량(수치) ················································································ 530
9-15 지적현황 측량 ··································································································· 531
9-15-1 지적현황 측량(도해) ················································································ 531
9-15-2 지적현황 측량(수치) ················································································ 533
9-15-3 지적불부합지조사 측량(도해) ·································································· 534
9-16 도시계획선명시 측량 ························································································ 536
9-16-1 도시계획선명시 측량(도해) ····································································· 536
9-16-2 도시계획선명시 측량(수치) ····································································· 537
9-17 도면작성 및 조서작성 ······················································································ 539
9-17-1 자동제도(좌표독취) ·················································································· 539
9-17-2 자동제도(좌표입력) ·················································································· 540
9-17-3 자동제도(파일제공) ·················································································· 540
9-17-4 도면작성 ··································································································· 541
9-17-5 조서작성 ··································································································· 542
목 차 23
건 축 부 문
제1장 철골공사 ·································································································· 545
1-1 철골 가공 조립(공장생산) ·················································································· 545
1-1-1 기본철골공수 ······························································································ 545
1-1-2 철골공수 산정방법 ····················································································· 545
1-1-3 기본용접공수 ······························································································ 545
1-1-4 용접공수 산정방법 ····················································································· 546
1-2 철골 세우기 ······································································································ 547
1-2-1 현장 세우기 ································································································ 547
1-2-2 탑다운공법 지하 현장 세우기 ··································································· 548
1-2-3 철골세우기 장비의 작업능력 ···································································· 549
1-2-4 고장력 볼트 본조임 ··················································································· 549
1-2-5 현장용접 ····································································································· 549
1-2-6 앵커 볼트 설치 ·························································································· 550
1-2-7 철골세우기용 장비의 가설 및 해체이동 ·················································· 550
1-3 데크플레이트 ····································································································· 551
1-3-1 데크플레이트 가스절단 ·············································································· 551
1-3-2 데크플레이트 플라즈마 절단 ···································································· 551
1-3-3 데크플레이트 설치 ····················································································· 551
1-4 부대공사 ·············································································································· 552
1-4-1 부대철골 설치 ···························································································· 552
1-4-2 스터드볼트(Stud bolt) 설치 ····································································· 552
1-4-3 철골 내화 피복뿜칠 ··················································································· 552
1-4-4 경량형강철골조 조립설치 ·········································································· 553
제2장 조적공사 ·································································································· 555
2-1 벽돌 ····················································································································· 555
2-1-1 벽돌 쌓기 ··································································································· 555
24 목 차
2-1-2 치장쌓기 및 줄눈설치 ··············································································· 556
2-1-3 아치쌓기 ····································································································· 556
2-1-4 아치쌓기 치장줄눈 설치 ············································································ 557
2-1-5 인방보 설치 ································································································ 557
2-2 블록 ····················································································································· 558
2-2-1 블록쌓기 ····································································································· 558
2-2-2 블록 보강쌓기 ···························································································· 558
2-3 ALC ····················································································································· 559
2-3-1 ALC블록 쌓기 ···························································································· 559
2-3-2 ALC패널 설치 ···························································································· 560
제3장 타일공사 ·································································································· 561
3-1 공통공사 ·············································································································· 561
3-1-1 바탕 고르기 ································································································ 561
3-1-2 타일줄눈 설치 ···························································································· 561
3-2 타일 붙임 ············································································································ 561
3-2-1 떠붙이기 ····································································································· 561
3-2-2 압착 붙이기 ································································································ 562
3-2-3 접착 붙이기 ································································································ 563
3-2-4 접착 붙이기(에폭시 접착제) ······································································ 563
제4장 목공사 ······································································································ 565
4-1 구조목공사 ·········································································································· 565
4-1-1 먹매김 ········································································································· 565
4-1-2 마루틀 설치 ································································································ 565
4-1-3 마루바탕 설치 ···························································································· 565
4-1-4 마루널 설치 ································································································ 565
4-2 수장목공사 ·········································································································· 566
4-2-1 벽체틀 설치 ································································································ 566
4-2-2 칸막이벽틀 설치 ························································································· 566
4-2-3 벽체합판 설치 ···························································································· 566
목 차 25
4-2-4 수장합판 설치 ···························································································· 566
4-2-5 커튼박스 설치 ···························································································· 567
4-3 부대목공사 ·········································································································· 567
4-3-1 토대설치 ····································································································· 567
4-3-2 목재데크틀 설치 ························································································· 567
4-3-3 목재데크 설치 ···························································································· 578
제5장 수장공사 ·································································································· 569
5-1 바닥 ····················································································································· 569
5-1-1 PVC계 바닥재 설치 ·················································································· 569
5-1-2 카페트 설치 ································································································ 569
5-1-3 플로어링 마루 설치 ··················································································· 569
5-1-4 이중바닥 설치 ···························································································· 570
5-2 천장 ····················································································································· 570
5-2-1 흡음텍스 설치 ···························································································· 570
5-2-2 열경화성수지천장판 설치 ·········································································· 570
5-2-3 석고판 설치(나사고정) ··············································································· 571
5-3 벽 ························································································································· 571
5-3-1 석고판 설치(나사고정) ··············································································· 571
5-3-2 석고판 설치(접착제 붙임) ········································································· 571
5-3-3 샌드위치(단열)패널 설치 ··········································································· 572
5-3-4 흡음판 설치 ································································································ 572
5-3-5 걸레받이 설치 ···························································································· 572
5-3-6 마루귀틀 설치 ···························································································· 573
5-3-7 도배바름 ····································································································· 573
5-4 단열 ····················································································································· 574
5-4-1 단열재 공간넣기 ························································································· 574
5-4-2 단열재 접착제 붙이기 ··············································································· 574
5-4-3 단열재 격자넣기 ························································································· 575
5-4-4 단열재 핀사용 붙이기 ··············································································· 575
5-4-5 단열재 타정 부착 ······················································································· 576
26 목 차
5-4-6 단열재 콘크리트타설 부착 ········································································ 576
5-4-7 단열재 슬래브위 깔기 ··············································································· 576
5-4-8 방습필름설치 ······························································································ 577
5-4-9 외벽단열공법 ······························································································ 577
제6장 방수공사 ·································································································· 579
6-1 공통공사 ·············································································································· 579
6-1-1 바탕처리 ····································································································· 579
6-1-2 방수프라이머 바름 ····················································································· 579
6-1-3 방수층보호재 붙임 ····················································································· 579
6-1-4 방수층 누름철물 설치 ··············································································· 580
6-2 도막방수 ·············································································································· 580
6-2-1 도막바름 ····································································································· 580
6-2-2 보강포 붙임 ································································································ 580
6-2-3 마감도료(Top-coat) 바름 ········································································· 580
6-3 시트 방수 ············································································································ 581
6-3-1 가열식시트 붙임 ························································································· 581
6-3-2 접착식시트 붙임 ························································································· 581
6-3-3 자착식시트 붙임 ························································································· 581
6-4 시멘트 모르타르계 방수 ···················································································· 582
6-4-1 시멘트 액체방수 바름 ··············································································· 582
6-4-2 폴리머 시멘트 모르타르방수 바름 ··························································· 582
6-4-3 방수모르타르 바름 ····················································································· 582
6-4-4 시멘트 혼입 폴리머계 도막방수 바름 ······················································ 583
6-5 기타방수 ·············································································································· 583
6-5-1 규산질계 도포방수 바름 ············································································ 583
6-5-2 액상형 흡수방지방수 도포 ········································································ 583
6-5-3 벤토나이트방수 붙임 ················································································· 584
6-6 부대공사 ·············································································································· 584
6-6-1 수밀코킹 ····································································································· 584
6-6-2 줄눈 절단 ··································································································· 585
목 차 27
6-6-3 줄눈 설치 ··································································································· 585
제7장 지붕 및 홈통공사 ···················································································· 587
7-1 지붕 ····················································································································· 587
7-1-1 금속기와 잇기 ···························································································· 587
7-1-2 금속판 평잇기 ···························································································· 587
7-1-3 금속판 돌출잇기 현장제작 ········································································ 587
7-1-4 금속판 돌출잇기 ························································································· 588
7-1-5 아스팔트싱글 설치 ····················································································· 588
7-1-6 폴리카보네이트 설치 ················································································· 589
7-1-7 후레싱 설치 ································································································ 589
7-2 홈통 ····················································································································· 589
7-2-1 금속 처마홈통 설치 ··················································································· 589
7-2-2 염화비닐 처마홈통 설치 ············································································ 590
7-2-3 금속 선홈통 설치 ······················································································· 590
7-2-4 염화비닐 선홈통 설치 ··············································································· 590
7-2-5 물받이홈통 설치 ························································································· 590
7-3 드레인 ·················································································································· 591
7-3-1 루프드레인 설치 ························································································· 591
제8장 금속공사 ·································································································· 593
8-1 제품 ····················································································································· 593
8-1-1 계단논슬립 설치 ························································································· 593
8-1-2 코너비드 설치 ···························································································· 593
8-1-3 와이어메시 바닥깔기 ················································································· 593
8-1-4 인서트(Insert) 설치 ··················································································· 593
8-1-5 조이너 및 몰딩 설치 ················································································· 594
8-1-6 천장점검구 설치 ························································································· 594
8-2 시설물 ·················································································································· 595
8-2-1 용접식난간 설치 ························································································· 595
8-2-2 앵커고정식난간 설치 ················································································· 595
28 목 차
8-2-3 철조망 울타리 설치 ··················································································· 596
8-2-4 경량천장철골틀 설치 ················································································· 596
8-2-5 경량벽체철골틀 설치 ················································································· 596
8-3 기타공사 ·············································································································· 597
8-3-1 잡철물 제작 및 설치 ················································································· 597
제9장 미장공사 ·································································································· 599
9-1 모르타르 바름 및 타설 ······················································································ 599
9-1-1 모르타르 배합 ···························································································· 599
9-1-2 모르타르 바름 ···························································································· 599
9-1-3 모르타르 타설 ···························································································· 600
9-1-4 표면 마무리 ································································································ 600
9-1-5 라스 붙임 ··································································································· 601
9-2 콘크리트면 마무리 ····························································································· 601
9-2-1 콘크리트면 정리 ························································································· 601
9-2-2 부분 마감 ··································································································· 601
9-2-3 전면 마감 ··································································································· 602
9-3 충전 ····················································································································· 602
9-3-1 창호주위 모르타르 충전 ············································································ 602
9-3-2 창호주위 발포우레탄 충전 ········································································ 603
9-3-3 주각부 무수축 모르타르 충전 ··································································· 603
9-3-4 우레탄폼 분사 충전 ··················································································· 603
제10장 창호 및 유리공사 ···················································································· 605
10-1 창호 ··················································································································· 605
10-1-1 목재창호 설치 ·························································································· 605
10-1-2 강재창호 설치 ·························································································· 605
10-1-3 알루미늄창호 설치 ··················································································· 605
10-1-4 합성수지창호 설치 ··················································································· 606
10-1-5 셔터설치(장치포함) ·················································································· 606
목 차 29
10-2 부속자재 ············································································································ 606
10-2-1 도어체크 설치 ·························································································· 606
10-2-2 플로어힌지 설치 ······················································································ 606
10-2-3 도어록 설치 ······························································································ 607
10-3 유리 ··················································································································· 607
10-3-1 창호유리 설치 ·························································································· 607
10-3-2 커튼월유리 설치 ······················································································ 607
10-4 커튼월 ··············································································································· 608
10-4-1 알루미늄 프레임 설치 ············································································· 608
10-4-2 외벽 패널 설치 ························································································ 608
10-4-3 코킹 ·········································································································· 609
제11장 칠공사 ······································································································ 611
11-1 공통공사 ············································································································ 611
11-1-1 콘크리트.모르타르면 바탕만들기 ··························································· 611
11-1-2 석고보드면 바탕만들기 ··········································································· 611
11-1-3 철재면 바탕만들기 ··················································································· 612
11-1-4 목재면 바탕만들기 ··················································································· 612
11-1-5 도장 후 퍼티 및 연마 ············································································· 612
11-1-6 비닐 보양 ································································································· 612
11-2 페인트 ············································································································· 613
11-2-1 수성페인트 붓칠 ······················································································ 613
11-2-2 수성페인트 롤러칠 ··················································································· 613
11-2-3 수성페인트 뿜칠 ······················································································ 613
11-2-4 유성페인트 붓칠 ······················································································ 614
11-2-5 유성페인트 롤러칠 ··················································································· 614
11-2-6 녹막이 페인트칠 ······················································································ 614
11-2-7 오일스테인칠 ···························································································· 615
11-2-8 에폭시 페인트칠 ······················································································ 615
11-2-9 낙서방지용 페인트칠 ··············································································· 615
11-2-10 걸레받이용 페인트칠 ············································································· 615
30 목 차
11-3 스프레이 ············································································································ 616
11-3-1 무늬코트칠 ································································································ 616
11-3-2 탄성코트칠 ································································································ 616
11-3-3 석재도료칠 ································································································ 616
목 차 31
기 계 설 비 부 문
제1장 배관공사 ·································································································· 621
1-1 강관 ····················································································································· 621
1-1-1 용접접합 ····································································································· 621
1-1-2 용접배관 ····································································································· 621
1-1-3 나사식 접합 및 배관 ················································································· 622
1-1-4 그루브조인트식 접합 및 배관 ··································································· 623
1-2 동관 ····················································································································· 624
1-2-1 용접접합 ····································································································· 624
1-2-2 용접배관 ····································································································· 625
1-3 스테인리스 강관 ································································································· 626
1-3-1 용접접합 ····································································································· 626
1-3-2 용접배관 ····································································································· 627
1-3-3 그루브조인트식 접합 및 배관 ··································································· 628
1-3-4 프레스식 접합 및 배관 ············································································· 629
1-3-5 주름관 접합 및 배관 ················································································· 629
1-4 주철관 ·················································································································· 630
1-4-1 기계식접합 및 배관 ··················································································· 630
1-4-2 수밀밴드 접합 및 배관 ············································································· 630
1-5 경질관 ·················································································································· 631
1-5-1 접착제 접합 및 배관 ················································································· 631
1-5-2 고무링 캡조임 접합 및 배관(일반 PVC) ················································· 631
1-5-3 고무링 캡조임 접합 및 배관(고강도PVC) ··············································· 632
1-6 연질관 ·················································································································· 632
1-6-1 폴리부틸렌(PB) 일반접합 및 배관 ··························································· 632
1-6-2 폴리부틸렌(PB) 이중관 접합 및 배관 ······················································ 633
1-6-3 가교화 폴리에틸렌관 접합 및 배관 ························································· 633
32 목 차
제2장 덕트공사 ·································································································· 635
2-1 덕트 ····················································································································· 635
2-1-1 아연도금강판덕트(각형덕트) 설치 ····························································· 635
2-1-2 아연도금강판덕트(스파이럴덕트) 설치 ····················································· 635
2-1-3 스테인리스덕트(각형덕트) 설치 ································································ 636
2-1-4 PVC덕트 설치 ···························································································· 636
2-1-5 세대내 환기덕트 설치 ··············································································· 636
2-1-6 플렉시블덕트 설치 ····················································································· 637
2-2 덕트기구 ·············································································································· 637
2-2-1 취출구 설치 ································································································ 637
2-2-2 흡입구 설치 ································································································ 638
2-2-3 덕트 플렉시블 조인트 설치 ······································································ 638
2-2-4 일반댐퍼(사각) 설치 ··················································································· 639
2-2-5 일반댐퍼(원형) 설치 ··················································································· 639
2-2-6 제연댐퍼 설치 ···························································································· 639
제3장 보온공사 ·································································································· 641
3-1 배관보온 ·············································································································· 641
3-1-1 일반마감 배관보온 ····················································································· 641
3-1-2 칼라함석마감 배관보온 ·············································································· 642
3-2 밸브보온 ·············································································································· 642
3-2-1 일반마감 밸브보온 ····················································································· 642
3-2-2 함석마감 밸브보온 ····················································································· 643
3-3 덕트보온 ·············································································································· 644
3-3-1 각형덕트 보온 ···························································································· 644
3-3-2 원형덕트 보온 ···························································································· 644
3-4 발열선 ·················································································································· 644
3-4-1 발열선 설치 ································································································ 644
3-4-2 분전함 설치 ································································································ 645
목 차 33
제4장 펌프 및 공기설비공사 ············································································· 647
4-1 펌프 ····················································································································· 647
4-1-1 일반펌프 설치 ···························································································· 647
4-1-2 집수정 배수펌프 설치 ··············································································· 647
4-1-3 펌프 방진가대 설치 ··················································································· 648
4-2 송풍기 및 환풍기 ······························································································· 648
4-2-1 송풍기 설치 ································································································ 648
4-2-2 벽걸이 배기팬 설치 ··················································································· 649
4-2-3 욕실배기팬 설치 ························································································· 649
4-2-4 무덕트 유인팬 설치 ··················································································· 649
4-2-5 레인지후드 설치 ························································································· 649
제5장 밸브설비공사 ··························································································· 651
5-1 밸브 ····················································································································· 651
5-1-1 일반밸브 및 콕류 설치 ············································································· 651
5-1-2 감압밸브장치 설치 ····················································································· 651
5-2 증기트랩 ·············································································································· 651
5-2-1 스팀트랩 장치 설치 ··················································································· 651
5-3 플랙시블 이음 및 팽창이음 ··············································································· 652
5-3-1 익스팬션조인트 설치 ················································································· 652
5-3-2 플랙시블커넥터 설치 ················································································· 652
5-4 수격방지기 ·········································································································· 653
5-4-1 수격방지기 설치 ························································································· 653
제6장 측정기기공사 ··························································································· 655
6-1 유량계 ·················································································································· 655
6-1-1 직독식 설치 ································································································ 655
6-1-2 원격식 설치 ································································································ 655
6-2 적산열량계 ·········································································································· 655
34 목 차
6-2-1 세대용 설치 ································································································ 655
6-2-2 건물용 설치 ································································································ 656
6-2-3 산업용 설치 ································································································ 656
제7장 위생기구설비공사 ···················································································· 657
7-1 위생기구류 ·········································································································· 657
7-1-1 소변기 설치 ································································································ 657
7-1-2 대변기 설치 ································································································ 657
7-1-3 도기세면기 설치 ························································································· 657
7-1-4 카운터형 세면기 설치(일체형) ·································································· 657
7-1-5 카운터형 세면기 설치(분리형) ·································································· 658
7-1-6 욕조 설치 ··································································································· 658
7-1-7 청소용 수채 설치 ······················································································· 658
7-2 수전 ····················································································································· 658
7-2-1 매립형 욕조수전 설치 ··············································································· 658
7-2-2 샤워수전 설치 ···························································································· 659
7-2-3 세면기수전 설치 ························································································· 659
7-2-4 씽크수전 설치 ···························································································· 659
7-2-5 손빨래수전 설치 ························································································· 659
7-3 욕실 부착물 ········································································································ 660
7-3-1 욕실거울 설치 ···························································································· 660
7-3-2 욕실금구류 설치 ························································································· 660
7-3-3 바닥배수구 설치 ························································································· 660
7-3-4 안전손잡이 설치 ························································································· 661
제8장 공기조화설비공사 ···················································································· 663
8-1 냉동기 및 냉각탑 ······························································································· 663
8-1-1 냉동기 반입 ································································································ 663
8-1-2 냉동기 설치 ································································································ 663
8-1-3 냉각탑 설치 ································································································ 664
8-2 공기조화기 ·········································································································· 667
목 차 35
8-2-1 공기가열기, 공기냉각기, 공기여과기 설치 ············································ 667
8-2-2 패키지형 공기조화기 설치 ········································································ 668
8-2-3 공기조화기(Air Handling Unit) 설치 ···················································· 668
8-2-4 천장형 에어컨 설치 ··················································································· 669
8-2-5 전열교환기 설치 ························································································· 670
8-3 보일러 및 방열기 ······························································································· 670
8-3-1 보일러 설치 ································································································ 670
8-3-2 경유보일러 설치 ························································································· 670
8-3-3 가스보일러(가정용) 설치 ··········································································· 671
8-3-4 온수보일러 설치 ························································································· 671
8-3-5 전기보일러 설치 ························································································· 671
8-3-6 방열기 ········································································································· 672
8-3-7 전기콘벡터 설치 ························································································· 672
8-4 온수기 및 온수분배기 ························································································ 672
8-4-1 전기온수기 설치 ························································································· 672
8-4-2 전기온수기(벽걸이형) 설치 ········································································ 673
8-4-3 온수분배기 설치 ························································································· 673
8-5 탱크 및 헤더 ······································································································ 673
8-5-1 오일서비스탱크 설치 ··············································································· 673
8-6 부수장비 ·············································································································· 674
8-6-1 로터리 오일 버너 ······················································································· 674
8-6-2 건타입 오일버너 ························································································· 674
제9장 기타공사 ·································································································· 675
9-1 지지금구 ·············································································································· 675
9-1-1 입상관 방진가대 설치 ··············································································· 675
9-1-2 잡철물 제작 및 설치 ················································································· 675
9-2 도장 ····················································································································· 676
9-2-1 바탕만들기 ·································································································· 676
9-2-2 녹막이페인트 칠 ························································································· 676
9-2-3 유성페인트 칠 ···························································································· 677
36 목 차
9-3 슬리브 ·················································································································· 677
9-3-1 슬리브 설치 ································································································ 677
9-3-2 배관을 위한 구멍뚫기 ··············································································· 677
9-4 배관관리 및 시험 ······························································································· 678
9-4-1 기밀시험 ····································································································· 678
9-4-2 시험점화 ····································································································· 679
9-5 시운전 및 조정 ··································································································· 679
9-5-1 시운전 ········································································································· 679
9-5-2 건물의 냉난방 및 공조설비 정밀진단(T.A.B) ········································· 679
제10장 소방설비공사 ··························································································· 681
10-1 소화함 ··············································································································· 681
10-1-1 옥내소화전함 설치 ··················································································· 681
10-1-2 소화용구 격납상자 설치 ········································································· 681
10-2 소방밸브 ············································································································ 681
10-2-1 알람밸브 설치 ·························································································· 681
10-2-2 준비작동식밸브 설치 ··············································································· 682
10-2-3 드라이밸브 설치 ······················································································ 682
10-2-4 관말시험밸브 설치 ··················································································· 682
10-3 옥외소화전 ········································································································ 682
10-3-1 지하식 설치 ······························································································ 682
10-3-2 지상식 설치 ······························································································ 683
10-4 송수구 ··············································································································· 683
10-4-1 일반송수구 설치 ······················································································ 683
10-4-2 방수구 설치 ······························································································ 683
10-4-3 연결송수구설치 ························································································ 683
10-5 탱크 ··················································································································· 683
10-5-1 압력공기탱크설치 ····················································································· 683
10-5-2 마중물탱크설치 ························································································ 684
10-6 소방용 유량계 ··································································································· 684
목 차 37
10-6-1 유량측정장치설치 ····················································································· 684
10-7 소화용 헤드 ······································································································ 684
10-7-1 스프링클러 헤드설치 ··············································································· 684
10-7-2 스프링클러 전기설비설치 ········································································ 684
10-8 소화기 ··············································································································· 685
10-8-1 소화약제 소화설비설치 ··········································································· 685
10-8-2 자동식 소화기 설치 ················································································· 686
10-9 피난기구 ············································································································ 686
10-9-1 완강기 설치 ······························································································ 686
제11장 가스설비공사 ··························································································· 687
11-1 강관 ··················································································································· 687
11-1-1 용접접합 ··································································································· 687
11-1-2 용접식 부설 ······························································································ 687
11-1-3 나사식 접합 및 배관 ··············································································· 688
11-2 PE관 ·················································································································· 688
11-2-1 버트 융착식 접합 및 부설 ······································································ 688
11-3 부속기기 ············································································································ 689
11-3-1 분기공 설치 ······························································································ 689
11-3-2 밸브 설치 ································································································· 690
11-3-3 직독식 가스미터 설치 ············································································· 690
11-3-4 원격식 가스미터 설치 ············································································· 690
제12장 자동제어설비공사 ···················································································· 691
12-1 계기반 및 함류 ································································································· 691
12-1-1 계기반 설치 ······························································································ 691
12-1-2 플랜트 계기 설치 ···················································································· 691
12-2 자동제어기기 ···································································································· 693
12-2-1 자동제어기기 설치 ··················································································· 693
12-2-2 계량기 설치 ······························································································ 693
38 목 차
12-2-3 도압배관 ··································································································· 694
12-2-4 Control Air 배관 ··················································································· 694
12-2-5 압축공기 발생장치 및 공기관 배관 ······················································· 695
12-3 전선배선 ············································································································ 695
12-3-1 중앙처리장치(CPU) 설치 ········································································ 695
12-3-2 입.출력장치(I/O Equipment) 설치 ······················································ 696
12-3-3 콘솔(Console) 설치 ················································································ 696
제13장 플랜트설비공사 ························································································ 697
13-1 플랜트 배관 ······································································································ 697
13-1-1 플랜트 배관 설치 ···················································································· 697
13-1-2 관만곡(Pipe Bending) 설치 ·································································· 706
13-1-3 밸브 취부 ································································································· 708
13-1-4 Fitting 취부 ····························································································· 709
13-1-5 Flange 취부 ····························································································· 710
13-1-6 Oil Flushing ··························································································· 713
13-1-7 장거리 배관 ······························································································ 713
13-1-8 이중보온관 설치 ······················································································ 714
13-2 플랜트 용접 ······································································································ 717
13-2-1 강관절단 ··································································································· 717
13-2-2 강판절단 ··································································································· 718
13-2-3 강관용접 ··································································································· 719
13-2-4 강판 전기아크용접 ··················································································· 723
13-2-5 예열(Electric Resistance Heating) ···················································· 726
13-2-6 응력제거 ··································································································· 727
13-2-7 아세틸렌량의 환산 ··················································································· 730
13-3 배관 및 기기보온 ····························································································· 731
13-3-1 pipe보온 ·································································································· 731
13-3-2 기기보온 ··································································································· 737
13-4 강재 제작 설치 ································································································· 738
13-4-1 보통 철골재 ······························································································ 738
목 차 39
13-4-2 철골 가공조립 ·························································································· 739
13-4-3 STORAGE TANK ··················································································· 739
13-4-4 강재류 조립설치 ······················································································ 743
13-4-5 도장 및 방청공사 ···················································································· 743
13-4-6 기계설비 철거 및 이설공사 ···································································· 743
13-4-7 탱크청소 ··································································································· 743
13-5 화력발전 기계설비 ··························································································· 744
13-5-1 보일러 설치 ······························································································ 744
13-5-2 보일러 드럼 설치 ···················································································· 746
13-5-3 덕트제작(Air, Gas) ················································································· 748
13-5-4 덕트 설치 ································································································· 749
13-5-5 공기예열기(Preheater) 설치 ·································································· 749
13-5-6 Soot Blower ··························································································· 750
13-5-7 Fan 설치 ·································································································· 751
13-5-8 터빈 설치 ································································································· 752
13-5-9 발전기 설치 ······························································································ 755
13-5-10 복수기 설치 ··························································································· 757
13-5-11 왕복압축기 설치 ···················································································· 758
13-5-12 펌프 설치 ······························································································· 759
13-5-13 Boiler Feed Pump 설치 ···································································· 760
13-5-14 Heater 및 Tank 설치 ········································································· 762
13-6 수력발전 기계설비 ··························································································· 764
13-6-1 수차 설치 ································································································· 764
13-6-2 발전기 설치 ······························································································ 767
13-6-3 수문 제작 ································································································· 771
13-6-4 수문 설치 ································································································· 774
13-6-5 Stop-Log 제작 ························································································ 777
13-6-6 Stop-Log 설치 ························································································ 779
13-6-7 수문 Hoist 설치 ······················································································ 780
13-6-8 Spiral Casing 설치 ················································································ 782
13-6-9 Steel Penstock 제작 ············································································· 785
13-6-10 Steel Penstock 현장설치 ···································································· 787
40 목 차
13-6-11 Roller Gate Guide Metal 제작 ························································ 788
13-6-12 Roller Gate Guide Metal 설치 ························································ 789
13-6-13 Tainter Gate Guide Metal 제작 ····················································· 791
13-6-14 Tainter Gate Guide Metal 설치 ····················································· 792
13-6-15 Trash Rack 제작 ················································································· 793
13-6-16 Trash Rack 설치 ················································································· 794
13-6-17 Tainter Gate Anchorage 제관 ························································· 796
13-7 제철기계설비 ···································································································· 797
13-7-1 고로본체 및 부속기기 설치 ···································································· 797
13-7-2 노정장입 장치 기기 설치 ········································································ 798
13-7-3 노체 4본주 및 DECK 설치 ··································································· 798
13-7-4 열풍로 본체 및 부속설비 설치 ······························································ 799
13-7-5 열풍로 DECK 설치 ················································································· 799
13-7-6 주선기 본체 및 부속기기 설치 ······························································ 800
13-7-7 Edge Mill 설치 ······················································································· 800
13-7-8 제진기 본체 및 부속설비 설치 ······························································ 801
13-7-9 Ventri Scrubber 본체 및 부속설비 설치 ··········································· 801
13-7-10 전등 Mud Gun 설치 ··········································································· 802
13-7-11 내화물(제철축로) 쌓기 ·········································································· 802
13-7-12 Craft 및 Tomlex Spray 공사 ··························································· 803
13-7-13 Castable Spray 공사 ·········································································· 803
13-7-14 혼선로 및 전로 본체 조립 설치 ·························································· 803
13-7-15 O2, N2 Spherical Gas Holder 조립설치 ······································· 804
13-7-16 가열로 본체 및 Recuperator실 조립설치 ········································· 804
13-7-17 균열로 본체 및 Recuperator실 조립설치 ········································· 805
13-7-18 가열로 및 균열로 부속기기 조립설치 ················································· 805
13-7-19 Mill Line 기기류 조립설치 ·································································· 806
13-7-20 Roller Table 조립설치 ········································································ 806
13-7-21 전기집진기 설치(Electric Precipitator) ············································ 807
13-7-22 노 기밀 시험 ························································································· 808
13-8 쓰레기소각 기계설비 ························································································ 808
13-8-1 소각로 설치 ······························································································ 809
목 차 41
13-8-2 폐열보일러 설치 ······················································································ 811
13-8-3 덕트 제작 및 설치 ·················································································· 812
13-8-4 반건식 반응탑 설치 ················································································· 812
13-8-5 탈질설비 설치 ·························································································· 813
13-8-6 여과집진기 설치(Bag filter) ·································································· 815
13-8-7 활성탄.반응조제 및 소석회 공급설비 설치 ·········································· 816
13-9 하수처리 기계설비 ··························································································· 817
13-9-1 수중펌프 설치 ·························································································· 817
13-9-2 모노레일 설치 ·························································································· 817
13-9-3 산기장치 설치 ·························································································· 818
13-9-4 오수처리시설 설치 ··················································································· 818
13-10 운반기계설비 ·································································································· 819
13-10-1 OPEN BELT CONVEYOR 설치 ························································ 819
13-10-2 OVER HEAD CRANE 설치 ································································ 820
13-10-3 GANTRY CRANE 설치 ······································································· 821
13-10-4 천장크레인 레일설치 ············································································· 823
13-11 기타 기계설비 ································································································ 824
13-11-1 일반기기 설치 ························································································ 824
13-11-2 Cooling Tower 설치 ·········································································· 824
13-11-3 Batcher Plant 설치 ············································································· 825
13-11-4 가설자재 손료율 ···················································································· 827
13-11-5 공사별 설치 소모자재[참고] ································································· 827
42 목 차
유 지 관 리 부 문
제1장 공 통 ······································································································· 831
1-1 토공사 ·················································································································· 831
1-1-1 비탈면 보강공 ···························································································· 831
1-1-2 지압판블록 설치 ························································································· 832
1-1-3 비탈면 점검로 설치 ··················································································· 832
1-2 조경공사 ·············································································································· 833
1-2-1 교통통제 및 안전처리 ··············································································· 833
1-2-2 일반전정 ····································································································· 833
1-2-3 조형전정 ····································································································· 834
1-2-4 가로수 전정 ································································································ 834
1-2-5 관목 전정 ··································································································· 835
1-2-6 수간보호 ····································································································· 835
1-2-7 줄기싸주기 ·································································································· 836
1-2-8 인력관수 ····································································································· 836
1-2-9 살수차관수 ·································································································· 836
1-2-10 제초 ·········································································································· 836
1-2-11 잔디깎기 ··································································································· 837
1-2-12 예초 ·········································································································· 837
1-2-13 교목시비(喬.施肥) ··················································································· 838
1-2-14 관목시비(灌.施肥) ··················································································· 838
1-2-15 잔디시비 ··································································································· 838
1-2-16 약제살포(기계) ························································································· 839
1-2-17 약제살포(인력) ························································································· 839
1-2-18 방풍벽 설치(거적세우기) ········································································· 839
1-2-19 은행나무 과실채취 ··················································································· 839
1-2-20 가로수 제거 ······························································································ 840
1-3 철근콘크리트공사 ······························································································· 841
1-3-1 콘크리트 균열 보수(표면처리공법) ··························································· 841
목 차 43
1-3-2 콘크리트 균열 보수(주입공법) ·································································· 841
1-3-3 콘크리트 균열 보수(패커주입공법) ··························································· 841
1-3-4 콘크리트 균열 보수(충전공법) ·································································· 842
1-3-5 콘크리트 단면처리 ····················································································· 842
1-3-6 콘크리트 단면복구 ····················································································· 842
1-3-7 워터젯 치핑 ································································································ 843
1-3-8 교량받침 교체 ···························································································· 843
1-3-9 교량신축이음 교체 ····················································································· 845
1-3-10 플륨관 해체 ······························································································ 846
제2장 토 목 ······································································································· 847
2-1 도로포장공사 ······································································································· 847
2-1-1 교통통제 및 안전처리 ··············································································· 847
2-1-2 포장 절단 ··································································································· 847
2-1-3 아스팔트 포장 절삭 후 아스팔트 덧씌우기(1회 절삭, 1회 포장) ········· 847
2-1-4 아스팔트 포장 절삭 후 아스팔트 덧씌우기(1회 절삭, 2회 포장) ········· 848
2-1-5 절삭 후 콘크리트 덧씌우기 ······································································ 849
2-1-6 아스팔트 절삭 및 덧씌우기 ······································································ 849
2-1-7 콘크리트 포장 절삭 후 아스팔트 덧씌우기 ············································ 850
2-1-8 소파보수(표층) ···························································································· 850
2-1-9 소파보수(포장복구) ···················································································· 852
2-1-10 소파보수(도로복구) ·················································································· 853
2-1-11 맨홀보수 ··································································································· 854
2-1-12 차선도색 ··································································································· 854
2-1-13 차선도색제거 ···························································································· 857
2-1-14 슬러리실 ··································································································· 857
2-1-15 표면평탄작업 ···························································································· 858
2-1-16 현장가열 표층재생공법 ··········································································· 858
2-1-17 재래난간 철거공 ······················································································ 859
2-1-18 교통 안전표지판 철거 ············································································· 859
2-1-19 교통 안전표지판 교체 ············································································· 860
2-1-20 도로반사경 철거 ······················································································ 860
44 목 차
2-1-21 도로반사경 교체 ······················································································ 860
2-1-22 도로표지병 제거 ······················································································ 861
2-1-23 시선유도표지 철거 ··················································································· 861
2-1-24 보도용 블록 인력철거 ············································································· 861
2-1-25 보도용 블록 장비사용 철거 ···································································· 862
2-1-26 보도용 블록 재설치(소형) ······································································· 862
2-1-27 보도용 블록 재설치(대형) ······································································· 863
2-1-28 보도용 블록 소규모보수 ········································································· 863
2-1-29 보차도 및 도로경계블록 철거 ································································ 864
2-1-30 보차도 및 도로경계블록 재설치 ····························································· 864
2-1-31 가드레일 철거 ·························································································· 865
2-2 궤도공사 ·············································································································· 866
2-2-1 철도안전처리 ······························································································ 866
2-2-2 궤광철거 ····································································································· 866
2-2-3 분기기 철거 ································································································ 866
2-2-4 레일교환(인력) ···························································································· 867
2-2-5 레일교환(기계) ···························································································· 867
2-2-6 침목교환(인력) ···························································································· 868
2-2-7 침목교환(기계) ···························································································· 869
2-2-8 분기기교환(인력) ························································································ 869
2-2-9 분기기교환(기계) ························································································ 870
2-2-10 도상자갈철거(인력) ·················································································· 870
2-2-11 도상자갈철거(기계) ·················································································· 870
2-2-12 도상갱환 ··································································································· 871
2-2-13 궤도정정 및 이설 ···················································································· 872
2-2-14 교상가드레일 철거 ··················································································· 872
2-2-15 목침목 탄성체결장치 철거 ······································································ 872
2-3 교량공사 ·············································································································· 873
2-3-1 강교보수 바탕처리(인력) ··········································································· 873
2-3-2 강교보수 바탕처리(장비) ··········································································· 873
2-4 관부설 및 접합 ··································································································· 874
2-4-1 상수관 세척 ································································································ 874
목 차 45
2-4-2 하수관 세정 ································································································ 874
2-4-3 관세관(스크레이퍼+워터젯트 병행 방법) ················································· 875
2-4-4 하수관 수밀시험 ························································································· 876
2-4-5 하수관 공기압시험 ····················································································· 876
2-4-6 하수관 준설(버킷식) ··················································································· 876
2-4-7 하수관 준설(흡입식) ··················································································· 877
2-4-8 하수도 수로암거 준설(흡입식) ·································································· 877
2-4-9 빗물받이 준설(인력식) ··············································································· 878
2-4-10 빗물받이 준설(흡입식) ············································································· 878
2-4-11 CCTV조사 ································································································ 879
2-4-12 주철관 철거 ······························································································ 879
2-4-13 원심력철근콘크리트관 철거 ···································································· 880
제3장 건 축 ······································································································· 881
3-1 구조물 철거공사 ································································································· 881
3-1-1 콘크리트구조물 헐기(인력) ········································································ 881
3-1-2 콘크리트구조물 헐기(기계) ········································································ 881
3-1-3 철골재 철거(인력) ······················································································ 882
3-1-4 철골재 철거(기계) ······················································································ 882
3-1-5 석축 헐기(인력) ·························································································· 883
3-2 해체공사 ·············································································································· 884
3-2-1 금속기와 해체 ···························································································· 884
3-2-2 흡음텍스 해체 ···························································································· 884
3-2-3 경량천장철골틀 해체 ················································································· 884
3-2-4 조적벽 해체 ································································································ 884
3-2-5 경량벽체철골틀 해체 ················································································· 885
3-2-6 석고판 해체 ································································································ 885
3-2-7 도배 해체 ··································································································· 885
3-2-8 PVC계바닥재 해체 ···················································································· 886
3-2-9 타일 해체 ··································································································· 886
3-2-10 기존방수층 및 보호층 철거 ···································································· 886
3-2-11 기존방수층 제거 및 바탕처리 ································································ 886
46 목 차
3-2-12 석면건축자재 해체 ··················································································· 887
3-3 칠공사 ·················································································································· 887
3-3-1 재도장 시 바탕처리(콘크리트.모르타르면) ·············································· 887
3-3-2 재도장 시 바탕처리(철재면) ······································································ 887
3-3-3 재도장 시 바탕처리(목재면) ······································································ 888
3-4 수선 및 보수공사 ······························································································· 888
3-4-1 지붕 덧씌우기 ···························································································· 888
3-4-2 지붕 재설치 ································································································ 889
3-4-3 도배 교체 ··································································································· 889
3-4-4 PVC계바닥재 교체 ···················································································· 889
3-4-5 타일 교체 ··································································································· 889
제4장 기계설비 ·································································································· 891
4-1 일반기계설비 해체 ····························································································· 891
4-1-1 배관 해체 ··································································································· 891
4-1-2 각형덕트 해체 ···························································································· 891
4-1-3 스파이럴덕트 해체 ····················································································· 892
4-1-4 배관보온 해체 ···························································································· 892
4-1-5 덕트보온 해체 ···························································································· 893
4-1-6 펌프 해체 ··································································································· 893
4-1-7 일반기계설비 철거 및 이설 ······································································ 893
4-2 자동제어설비 해체 ····························································································· 894
4-2-1 철거 및 이설 ······························································································ 894
4-3 수선 및 보수공사 ······························································································· 895
4-3-1 유량계 교체 ································································································ 895
4-3-2 관갱생공 ····································································································· 895
4-3-3 배관누수 검사 ···························································································· 896
목 차 47
참 고 자 료
삭제예정항목 ··············································································································· 897