기준 2025_국도건설공사설계실무요령_제02편공종별수량내역서및산출요령_01-01_공종별수량내역서_토공
2026.10.12 16:11
II 편
제2편 공종별 수량내역서
및 산출요령 ················ 517
제1장 공종별 수량 내역서 ······· 519
제2장 수량산출요령 ·················· 649
제3장 단가산출요령 ·················· 827
국도건설공사 설계실무 요령
/ 제 1장 /
공종별 수량 내역서
1. 토공 ···································································································· 521
2. 비탈면공 ····························································································· 525
3. 배수공 ································································································ 527
4. 구조물공 ····························································································· 539
5. 지하차도공 ························································································· 613
6. 터널공 ································································································ 619
7. 포장공 ································································································ 628
8. 교통안전시설공 ·················································································· 636
9. 부대공 ································································································ 640
- 521 -
1 토공
번 호 공 종 규 격 단위 수 량 비 고
1. 토 공
1.01 기존구조물깨기
a 무근콘크리트 깨기 기계 100%
a-1 무근콘크리트 T=30cm미만 ㎥
a-2 무근콘크리트 T=30cm이상 ㎥
b 철근콘크리트 깨기 기계 100%
b-1 철근콘크리트 T=30cm미만 ㎥
b-2 철근콘크리트 T=30cm이상 ㎥
c 석축 헐기
c-1 석축 헐기(찰쌓기) ㎡
c-2 석축 헐기(메쌓기) ㎡
d 기존포장 깨기
d-1 콘크리트 기계 ㎥
d-2 아스팔트 기계 ㎥
d-3 보도블럭 포장헐기 ㎡
e 포장절단
e-1 콘크리트 기계 m
e-2 아스팔트 기계 m
f 호안블럭 헐기 ㎡
g 돌망태 헐기 ㎡
h 가드레일 철거 m
i 강교철거 ton
j P.S.C Beam 철거 본
k 건설폐기물 파쇄 (100m, 크러셔) ㎥
1.02 측구뚝쌓기 인 력 ㎥
1.03 표토제거 자연상태
a 답구간 ㎡
b 답외구간 ㎡
c 비옥토 수거 T=20cm ㎡
1.04 벌개제근 및 가로수 제거
a 벌개제근
a-1 벌목 D=30cm미만 ㎡
a-2 벌개제근(뿌리뽑기) 기계100% ㎡
b 가로수제거 본
- 522 -
번 호 공 종 규 격 단위 수 량 비 고
1.05 땅깎기
a 토사깎기
a-1 토사 도쟈19TON ㎥
a-2 토사 도쟈32TON ㎥
b 리핑암깎기 도쟈32TON ㎥
c 발파암깎기
c-1 발파암깎기 브레이커-기계 ㎥
c-2 발파암깎기 소형브레이커 ㎥
d 미진동굴착공법
d-1 미진동굴착(TYPE-Ⅰ) ㎥
d-2 유압식할암공법 ㎥
e 정밀진동제어발파(TYPE-Ⅱ) ㎥
f 진동 제어발파
f-1 진동 제어발파(TYPE-Ⅲ) 소규모 ㎥
f-2 진동 제어발파(TYPE-Ⅳ) 중규모 ㎥
g 일반발파(TYPE-Ⅴ) ㎥
h 대규모발파(TYPE-Ⅵ) ㎥
i 발파암소할 ㎥
j 시험발파비 회
1.06 유용토 운반 자연상태
a 무대운반
a-1 토 사 ㎥
a-2 리핑암 ㎥
a-3 발파암 ㎥
b 도쟈운반
b-1 토 사 L= m ㎥
b-2 리핑암 L= m ㎥
b-3 발파암 L= m ㎥
c 덤프운반
c-1 토 사 L= m ㎥
c-2 리핑암 L= m ㎥
c-3 발파암 L= m ㎥
1.07 순쌓기 운반 자연상태
a 토 사 L= m ㎥
b 리핑암 L= m ㎥
c 발파암 L= m ㎥
d 토취장사용료 ㎥
- 523 -
번 호 공 종 규 격 단위 수 량 비 고
1.08 사 토 자연상태
a 토 사 L= m ㎥
b 리핑암 L= m ㎥
c 발파암 L= m ㎥
1.09 흙쌓기
a 노 체 ㎥ 다짐상태
b 노 상 ㎥ 다짐상태
c 녹지대 비다짐 ㎥
d 암쌓기
d-1 암쌓기 다짐도 90%이상 ㎥
d-2 필터층 ㎥
d-3 비탈면흙쌓기 ㎥
1.10 뒷채움 및 다짐공 ㎥
1.11 노상준비공
a 깎기부 ㎡
b 기존도로부 ㎡
1.12 되메우기 및 다짐공
a 되메우기 및 다짐 기계 100% ㎥
b 되메우기(비다짐) 기계 100% ㎥
1.13 쌓기비탈면 다짐 기계 ㎡
1.14 층따기 기계 ㎥
1.15 토공 규준틀 설치
a 비탈규준틀
a-1 직선부 ea
a-2 곡선반경 300m 이상 ea
a-3 곡선반경 300m 미만 ea
a-4 지형이 복잡한 장소 ea
b 수평규준틀 ea
1.16 연약지반처리공
a 침하토 쌓기 및 다짐 ㎥
b 샌드매트 부설 T= cm ㎥
c P.P 매트 부설
c-1 P.P 매트 5Ton/m ㎡
- 524 -
번 호 공 종 규 격 단위 수 량 비 고
c-2 P.P 매트 10Ton/m ㎡
c-3 P.P 매트 15Ton/m ㎡
d P.E.T 매트 부설
d-1 P.E.T 매트 15Ton/m ㎡
d-2 P.E.T 매트 20Ton/m ㎡
e 샌드드레인 ø=400m/m m
f 샌드콤팩션파일 ø=700m/m m
g 팩 드레인 D120m/m m
h 표토제거 ㎡
i 과재쌓기 비다짐 ㎥
j 과재쌓기 제거 ㎥
k 치환토 ㎥
l 침하판 ea
m 침하측정봉 및 보호관 m
n 경사계 설치 ea
o 간극수압계 설치 ea
p 수위측정기 설치 ea
q 층별 침하계 설치 ea
r 유공관(Φ100mm) m
1.17 자재운반비
a 모래운반 ㎥
1.18 자재대
a 모 래 상 차 도 ㎥